Addressing Humidity-Induced Risks of High-Voltage Switchgear: Comprehensive Moisture Removal Strategies

Source:


High humidity causes condensation on high-voltage switchgear, leading to insulation damage and severe faults. Chongqing Sennan Electric proposes 9 solutions, including equipment cleaning, high-voltage room sealing, waterproofing cable trenches, installing dehumidifiers, and optimizing architectural design. These measures effectively mitigate moisture risks and ensure safe operation of electrical equipment.

In southern China, the autumn and winter seasons are characterized by poor lighting conditions, frequent precipitation, and relatively high air humidity, which has become a major headache for the operation and maintenance personnel of high-voltage switchgear. The humid environment poses significant safety hazards to the electrical equipment inside the high-voltage switchgear and is highly likely to trigger power accidents.


When the air humidity reaches a certain saturation level, the moist air will condense on the electrical equipment with lower temperatures. Moisture and condensation can lead to insulation damage of the switchgear, easily causing faults such as external insulation flashover breakdown to ground, internal insulation flashover breakdown to ground, phase-to-phase insulation flashover breakdown, lightning overvoltage flashover breakdown, insulator bushing pollution flashover/breakdown/explosion, lifting rod flashover, CT (Current Transformer) flashover/breakdown/explosion, and insulator fracture. Such faults may spread to adjacent cabinets, resulting in busbar voltage loss and extensive equipment damage. Faced with this situation, how to address the problem? Chongqing Sennan Electric believes that moisture removal for high-voltage switchgear in high-humidity environments should be carried out from the following aspects:
(1) Clean the electrical equipment inside the high-voltage switchgear during power outages to keep the interior of the switchgear clean.
(2) Seal the high-voltage room. Implement air filtration measures for the ventilation windows and vents of the high-voltage room in accordance with regulatory requirements to maintain clean air inside.
(3) Conduct waterproof sealing for the cable trenches, cable tunnels, and cable holes under the switchgear, and install natural ventilation and moisture exhaust channels to keep the air in the cable tunnels dry.
(4) Install SEPRI-CS-L industrial dehumidifiers in the high-voltage room to maintain dry air inside.
(5) The fixed steel plate for the outgoing wall bushing shall be installed at a distance of at least 100mm from the external wall surface along the center line of the wall. The gap between the fixed steel plate and the frame of the outgoing wall bushing shall be sealed with tinned high-voltage seals. The gap between the frame and the wall window shall be sealed with building waterproof materials.
(6) Improve the architectural design of the high-voltage room: add edge plates on the top of the high-voltage room roof and install canopies above the outgoing wall bushings.
(7) Timely eliminate roof leakage defects of the high-voltage room.
(8) Replace the iron plate at the bottom of the indoor enclosed bus duct for outgoing lines with a steel wire mesh plate, or open a 100mm horizontal gap (near the wall). When rainwater enters from the fixed steel plate of the outgoing wall bushing, it can be discharged through the gap without entering the switchgear.
(9) For switchgear with low insulation margin and poor operating environment, install SPR-CN-S1 intelligent dehumidifiers or top-mounted dehumidification devices, which can automatically control and remove moisture inside the cabinet based on humidity levels.
In summary, the electrical equipment inside high-voltage switchgear has high requirements for the operating environment. An excessively humid environment is prone to causing safety problems in the operation of electrical equipment. Timely adoption of moisture removal measures for high-voltage switchgear is of great significance for improving the power operation environment.

high-voltage switchgear,electrical equipmen

Latest Updates

2026-09-09

Representatives of Brazil’s Araguari Importadora Visited Our Factory for EV Charging Station Project Negotiation

Release Date: [Please fill in the specific date] Recently, professional representatives from Brazil’s Araguari Importadora paid an official factory visit to our company. Both parties focused on in-depth communication and business negotiation centering on EV charging pile cooperation projects, overseas market adaptation and project landing arrangements. During the visit, the Brazilian delegation conducted a comprehensive and systematic factory audit and on-site inspection. The team checked the production management procedures, product quality control standards, product performance parameters and overseas project delivery capabilities related to new energy charging equipment. Meanwhile, the two sides had detailed exchanges on the technical specifications, certification requirements, customized solutions and bulk supply plans of EV charging piles suitable for the Brazilian local market. The representatives of Araguari Importadora spoke highly of our standardized production system, stable product quality and professional overseas project service capability. They fully recognized the compatibility and practicality of our charging pile products for the South American market environment, and put forward targeted demands for follow-up product customization and cooperative operation.

2026-09-09

Chongqing Liyang Industry Leadership Team Conducted On-site Inspection to Advance Power Capacity Expansion Project Layout

Chongqing Liyang Industry’s core management team completed an on-site inspection and in-depth project communication. Both sides conducted full discussions on the planning, technical standards and implementation details of the power capacity expansion project for production expansion, reached preliminary cooperation consensus, and laid a crucial foundation for the smooth advancement and formal implementation of subsequent supporting power engineering projects.

2026-09-08

Shipment of 39 DC Fast EV Chargers Bound for Brazil

39 units of our DC fast EV chargers have departed our factory for Brazil.

Get a Quote

Your consultation will help us provide you with the most accurate quotation information

Submit

*Please fill in the above fields (fields marked with an asterisk are required), and we will reply to your feedback as soon as possible.